Marrınn Book a demo

Agentic Aı for oil and gas.

Squids run operations across the site, from the hot work permit to the release report. Marrinn builds work order, permit to work and reporting systems for operators and contractors, and connects them to the maintenance, document and finance systems you already run. A named role approves. Ledger records who did what.

Keep your plant historian. See every asset on one live map.

The historian, the maintenance system and the permit system stay where they are. TagFlow keeps a current copy of each, matches their records, and Squids work from the result.

Explore Marrinn Digital Twin

Asset and safety management, built around how you run it.

Each module an operator runs, and where it comes from: built for you by Marrinn, in TagFlow today, or the system you already run, connected.

A processing plant at night, with storage tanks, pipework and lit walkways

Select a module

  • Built for you by Marrinn
  • In TagFlow today
  • Your system, connected
Maintenance and work ordersYour system, connected

Your system, connected

Maintenance and work orders

Notifications, backlog hours, deferrals and safety critical flags.

A Squid reads asset history and spares, then drafts the work order and priority. The maintenance supervisor approves.

The HSE raised 616 non-compliance issues in 125 offshore inspections in 2024.

Permit to workBuilt for you by Marrinn

Built for you by Marrinn

Permit to work

Permit requests, isolation and conflict checks, timed approvals.

A Squid checks open permits, isolations and competence, then drafts the permit with conflicts listed. The area authority approves.

Open permits, isolations and conflicts are checked before a permit is issued, and each approval is timed.

Management of changeBuilt for you by Marrinn

Built for you by Marrinn

Management of change

Change records, risk review and action closure before start-up.

A Squid drafts the change record and lists open actions before start-up. The technical authority approves.

The change, its risk review and every open action are held on one record until start-up is signed.

Asset integrity and verificationBuilt for you by Marrinn

Built for you by Marrinn

Asset integrity and verification

Safety critical element register, performance standards and inspection evidence.

A Squid collects inspection evidence for each barrier and drafts the verification pack. The integrity lead approves.

30% of 477 HSE offshore topic scores in 2024 were poor, very poor or unacceptable.

HSE incidents and RIDDORIn TagFlow, extended for you

In TagFlow, extended for you

HSE incidents and RIDDOR

Incident log, classification, regulator report and investigation tasks.

A Squid suggests the classification, drafts the report and opens investigation tasks. The HSE lead approves.

92 hydrocarbon releases were reported in 2024, and 57 of 180 RIDDOR dangerous occurrences were releases.

Turnaround planningBuilt for you by Marrinn

Built for you by Marrinn

Turnaround planning

Scope freeze, deferrals, spares and budget in one gate.

A Squid groups the backlog into a draft scope and checks spares per line. The turnaround manager approves.

The frozen scope, each deferral, the spares and the budget are held as one record before shutdown.

Regulator and emissions returnsIn TagFlow, extended for you

In TagFlow, extended for you

Regulator and emissions returns

NSTA returns, emissions data and permit records.

A Squid compiles figures from the source systems and drafts the return. The head of regulatory affairs approves.

Each figure in a return is traced to its source system, and sign-off is recorded by name.

Contractor competenceBuilt for you by Marrinn

Built for you by Marrinn

Contractor competence

Competence and induction records checked against the task.

A Squid checks competence and expiry before a permit or crew change. The contracts manager approves.

Each person's competence and expiry dates are checked against the task before a permit or crew change.

Offshore drilling rigs against a dusk sky

Already on SAP, IBM Maximo, Enablon or Sphera? Keep it, or run it on Marrinn.

Squids read from the system you run today. Where TagFlow has the module, you move that work across; where it does not, Marrinn builds it from your requirements.

  • IBM Maximoor built by Marrinn
  • SAPor built by Marrinn
  • Oracleor built by Marrinn
  • Enablonor TagFlow Risk and Compliance
  • Proscientor built by Marrinn
  • Spheraor TagFlow Risk and Compliance
  • Intelexor TagFlow Risk and Compliance
  • SharePointor TagFlow Document Management

Where oil and gas operators lose time, and what it costs.

Every figure comes from a published source, named under it. Most describe the UK Continental Shelf.

  • 30%of offshore topic assessments rated poor, very poor or unacceptable in 2024Health and Safety Executive, Offshore Statistics and Regulatory Activity Report 2024, published September 2025.
  • 92hydrocarbon releases in 2024, 57 of them reportable under RIDDORHealth and Safety Executive, Offshore Statistics and Regulatory Activity Report 2024.
  • Over 7 in 10maintenance managers name scheduling and planning as their greatest struggleAdd Energy maintenance manager survey, 2022, as reported by the Journal of Petroleum Technology.
  • £43.4bnestimated cost to complete the remaining UK Continental Shelf decommissioning programmeNorth Sea Transition Authority, UKCS decommissioning cost and performance update, 13 August 2026.

Each system acts on half the picture.

  1. 1Two systems
  2. 2One acts alone
  3. 3What goes wrong
  4. 4The Digital Twin
  5. 5A person decides

Compressor K-201 is in AVEVA PI and SAP PM. Each holds a different fact.

The control room acknowledges the alarm. It cannot see what SAP PM knows.

No repair is raised in the asset system. The compressor runs until it trips, and production stops with it.

The Digital Twin puts both on one record for Compressor K-201 and flags the clash.

The maintenance supervisor approves a priority 2 work order. Nothing goes out before that.

AVEVA PIPlant historianActing now

Vibration rising for 4 hours.

SAP PMAsset system

No work order open.

Nobody sees itRising vibration with no work order

FlaggedRising vibration with no work order

Maintenance supervisorApproves a priority 2 work order ApproveApproved

The cost of not having a Digital Twin.

Each system acts on what it can see. These mistakes happen in the gaps between them.

Without a Digital Twin6 failures between your systems
  1. Production stopsA compressor runs until it trips because no repair was raised.HistorianAsset system
  2. Permits on failing plantPermits are issued without the latest condition of the equipment.PermitsHistorian
  3. Two jobs that should never meetTwo permits allow work side by side in the same area.PermitsWork orders
  4. Contractors on site with lapsed trainingTraining is in one system and the site pass in another.TrainingAccess
  5. Emissions found at reporting timeReadings and repair records meet only when the report is due.HistorianEnvironment
  6. A maintenance record in three placesHistory is split between the historian, the asset system and paper.Every system
AI agents make these mistakes too, because each one reads only the systems it is connected to.The maintenance agent sees no open work order on K-201, but not four hours of rising vibration, so it raises no repair.
See the Digital Twin catch one

Keep the systems you run. TagFlow joins each compressor’s records into one page, and Squids work from it.

Compressor K-201 is tag K-201-VT-01 in AVEVA PI, functional location 10004582 in SAP PM and Export comp. A, EQ-0113, in Sphera. TagFlow matches the first two exactly; the Sphera record has no tag and scores 79 percent on name and area, and the area authority confirms it, so TagFlow keeps one page for the compressor, linked to its work order, its last bearing change, the bearing kit and the vibration trend. At 14:36 AVEVA PI reports vibration above the alarm limit, read only. Maintenance Squid drafts the work order from the SAP PM history and finds 2 bearing kits in stock. Integrity Squid reads the vibration trend, up for 4 hours, in AVEVA PI. Permit Squid reads the Sphera record and lists the open permits in area A. The maintenance supervisor approves K-201 and 2 others at 14:50. At 14:51 the repair is planned, the 2 others the same, and AVEVA PI is unchanged. Marrinn writes to no control system.

  1. Match its records
  2. Alarm raised
  3. Squids work
  4. Supervisor approves
  5. Repair planned

AVEVA PI stays where it is. TagFlow keeps a current copy. How we connect what you keep

Squids that know how your organisation runs.

Before a Squid acts, it reads the record, its history, your procedures and the duty that applies. Then it hands the work to the next module, and a named role decides.

Scope freeze is 26 weeks out. The backlog, the spares and the budget are on one page by Monday.

Maintenance system (CMMS)Turnaround TAR-2027-03Scope freeze gate reached, Module B shutdown

AWhat the Backlog Squid reads first

  • RecordMaintenance and work orders, built to order412 open work orders tagged for the shutdown
  • HistoryMaintenance and work orders, built to orderValve V-310 inspection deferred twice since 2025
  • PolicyTurnaround procedure rev 4Safety-critical items cannot be deferred without approval
  • PeopleTagFlow PeopleTurnaround manager owns scope; planner on leave until Friday

BSquids across your modules

  1. Maintenance and work orders, built to orderBacklog SquidGroups open work and deferred items into a draft scopeHands to Materials Squid
  2. Inventory & WarehouseMaterials SquidChecks spares stock and supplier lead times per lineHands to Budget Squid
  3. BudgetsBudget SquidPrices each line against the approved turnaround budget

CWho decides

TMTurnaround managerAccept, reject or defer each proposed scope line ApproveApproved

LedgerEvery step, with the time and the role

A photographed field ticket arrives at 15:05. Two disagreeing lines are flagged by 15:10.

Contractor portal and emailField ticket FT-30918Photographed ticket received for Module B rope access crew

AWhat the Ticket Squid reads first

  • RecordDocument ManagementTicket: 6 crew, 11 hours, 2 days
  • HistoryTagFlow FinanceSame contractor: 3 rate corrections in 12 months
  • PolicyContracts CLMCall-off rate £68 per hour, overtime after 10 hours
  • PeopleTagFlow PeopleCost controller approves; deputy covers until Thursday

BSquids across your modules

  1. Document ManagementTicket SquidReads the photographed ticket into structured linesHands to Match Squid
  2. Contracts CLMMatch SquidChecks lines against PO, call-off rates and hoursHands to Payables Squid
  3. TagFlow FinancePayables SquidDrafts the invoice, coded to AFE and partner share

CWho decides

CCCost controllerApprove the corrected lines and the invoice posting ApproveApproved

LedgerEvery step, with the time and the role

An inspection letter lands with six issues. Each has an owner, a date and the evidence by lunchtime.

Regulator correspondenceLetter HSE-2026-0147Offshore inspection letter, six maintenance and control of work issues

AWhat the Compliance Squid reads first

  • RecordDocument ManagementLetter lists 6 issues, response due in 28 days
  • HistoryRisk & ComplianceIssue 3 repeats a finding from last year's audit
  • PolicyManagement of changePlant and procedure changes need an approved record
  • PeopleTagFlow PeopleInstallation manager owns issues 1 to 4

BSquids across your modules

  1. Risk & ComplianceCompliance SquidSplits the letter into actions with owners and datesHands to Investigation Squid
  2. Incident and inspection reporting, built to orderInvestigation SquidPulls asset history and drafts a cause analysisHands to Response Squid
  3. Document ManagementResponse SquidDrafts the reply with evidence attached per issue

CWho decides

HHHead of HSEApprove the reply before it goes to the regulator ApproveApproved

LedgerEvery step, with the time and the role

What Marrinn runs for an operator.

Every part runs under one permission model, with one record of every action. Each links to its page.

  • Maintenance and work orders

    Notifications, work orders, backlog in hours and planned routines, connected to the maintenance system you run today.

    See TagFlow

  • Permit to work and control of work

    Permit requests, isolation and conflict checks, approvals and expiry, built to your procedure.

    How we build it

  • Incident and inspection reporting

    Incidents, near misses, inspection findings and audit actions, each with an owner, a date and a history.

    See TagFlow

  • Squids for the field and the office

    Agents that read, draft and chase inside the permissions you set and a budget you control.

  • Voice agents for field reporting

    Agents that take the call, having already read the number and pulled the caller’s record. 31 languages per agent, about 90 percent of the world’s population.

    See voice agents

  • Records and audit trail

    Every action is recorded with who approved it. Exports and a configurable retention period are supported.

  • Legacy migration

    Move records out of a legacy system in dry runs before anything is switched over.

    See Marrinn Migrate

  • Reports and board packs

    Backlog by installation, approvals by role and open actions by owner, with plain-English queries.

    See Marrinn Reports

  • Systems built to your requirements

    Custom software built in short rounds, with a first working, secure version in about 10 days.

    Read how we build

The rules your systems have to show they follow.

These are the terms operators on the UK Continental Shelf are held to. Marrinn builds the records and controls that let a team show it follows them.

  • Safety Case Regulations 2015A safety case for each installation, accepted by the regulator and kept current.
  • Offshore Safety Directive RegulatorThe regulator, run by the Health and Safety Executive with the environment regulators, that inspects offshore operators.
  • Asset integrity and safety-critical elementsSafety and environmentally critical elements need performance standards, a verification scheme and a record that maintenance was done.
  • PFEER and DCRFire, explosion and emergency response duties, and design and construction duties for installations.
  • RIDDORReportable injuries, dangerous occurrences and hydrocarbon releases are reported to the regulator.
  • Permit to work and management of changeControl of work needs a clear, timed approval, and changes to plant or procedure need an approved record.
  • North Sea Transition AuthorityThe licensing and stewardship regulator for offshore oil and gas, with its own data and reporting duties.
  • OPRED permits and UK ETSEnvironmental permits and emissions reporting for operators.
  • UK GDPRA lawful basis for personal data, including competence and medical records for the workforce.
  • ISO 55001 and ISO 45001Asset management and occupational health and safety management systems.

rules answered from one record: who, what, when and why. You show it. You do not rebuild it.

What an operator can check before the first round of work.

Check the sector evidence below, the connections to your systems, the hosting choices and the first working version.

A first version in about 10 days

A first working, secure version in about 10 days, then rounds of change until you sign it off.

  • Your systems stay connected. Squids work through connections to the maintenance, document and finance systems you already run, so nothing is re-keyed.
  • Hosted where you decide. On our cloud, in your own cloud account or on your own servers, so a restricted site or network can keep its data in place.
  • 125offshore inspections in 2024, with 616 non-compliance issuesHealth and Safety Executive, Offshore Statistics and Regulatory Activity Report 2024.
  • 71%of engineering construction employers report hiring difficultiesECITB Workforce Census, published 18 February 2025.
  • £2.6bnspent on UKCS decommissioning in 2025, a recordNorth Sea Transition Authority, 13 August 2026.

Hosted where your security policy says.

Licensing and hosting are set out in plain terms before the first round of work begins. Operators with restricted networks can run the system on their own servers.

  1. Our cloudHosted and run by Marrinn
  2. Your cloud accountIn your own tenancy, under your keys
  3. Your own serversOn your premises, with your records on your hardware

Licensed per user. You own your data and can export it at any time.

Questions an operator asks first.

Questions buyers ask before a demo.

Can Marrinn connect to our maintenance and permit systems?

Yes. Squids work through connections to the systems you already run, and Marrinn Migrate moves records out of a legacy system in dry runs before anything is switched over. Which systems to connect first is decided in the discovery session.

Does a Squid make safety decisions?

No. A Squid reads, drafts and chases. A named role that you set approves each action, such as the maintenance supervisor or the area authority, and the Ledger records who approved it and when.

Can the system run on our own servers?

Yes. You can host on our cloud, in your own cloud account or on your own servers. You choose, and you can export your records at any time.

How soon do we see a working system?

A first working, secure version in about 10 days, then rounds of change until you sign it off.

What has Marrinn delivered, and does it apply to an operator?

Marrinn has delivered correspondence, business process, risk, KYC and CRM systems for government and investment clients. Permit to work, maintenance and HSE reporting are the same kind of work: records that move through approvals, with a deadline, an owner and an audit trail. The same platform and build method apply. A first working, secure version of one of your processes in about 10 days is the proof.

Do we have to replace our systems in one move?

No. Marrinn connects to what you run first, and a legacy system is retired when its records have been moved and checked in a dry run.

See an oil and gas workflow run on your own procedures.

Thirty minutes with the Marrinn team, on the process that takes your team the longest. We reply within one UK business day.

Book a demo

By submitting you agree to be contacted about Marrinn. We never share your details. See our privacy notice.